Browse through our video library and watch how URETEK demonstrates its concrete lifting technology in the most challenging environments.

In the News…

The Tilting Silo Gets Stabilized

The Tilting Silo Gets Stabilized

A four story storage silo sitting on a thick concrete pad had settled significantly causing the silo to tilt and be inoperable. The company needed a strong solution that could bear this heavy load & repair the settlement!

read more
A Texas Prison Gets Rehabilitated

A Texas Prison Gets Rehabilitated

Prison Gets Rehabilitated An unstable floor at a Texas prison has settled over 7 inches and is in need of rehabilitation.  With relocating over 2,000 inmates out of the question, URETEK’s injection technology is a welcome site. Even routine repairs present unique...

read more
Winter Break Provides Time for School Repairs

Winter Break Provides Time for School Repairs

Many schools and universities will soon be on winter break, closing their doors for a few weeks while students enjoy a little rest & relaxation. This downtime is the perfect opportunity to take advantage of the empty classrooms and make necessary repairs to...

read more
Significant Slab Repair at Hotel Parking Garage

Significant Slab Repair at Hotel Parking Garage

A Courtyard Marriott Hotel in Phoenix, Arizona faced significant slab settlement on their busy parking garage ramp. THE PROBLEM The large, heavily reinforced parking garage ramp slab had settled approximately 3″ inches. The hotel was concerned the settlement was...

read more

Project Videos

URETEK Commercial Concrete Lifting

Mitigate risk for your 24/7 facility with URETEK’s preventative maintenance solutions.  Reduce liability, avoid downtime and environmental costs associated with rip and replace by restoring concrete.  URETEK’s structural grade polymer extends service life of concrete (interior and exterior) quickly, with long term results.  Nationwide service!  Take control now!

URETEK Stabilizes Sinking Railway

After saturated conditions weaken a 3 foot thick concrete base under a long span of rail track, URETEK crews work in tight conditions with over 12,000 volts buzzing overhead to stabilize the compromised track using structural grade polymer.

Port of Oakland – Soil Stabilization

Drive lanes succumb to non-stop, overwhelming weight from massive overhead cranes at one of the busiest ports in the nation.  Engineers choose URETEK’s Deep Injection® Process to lift and stabilize port drive lines without shutting down operations.

URETEK Stabilizes Sinking Gypsum Dome

One of the largest gypsum plants in the U.S. experienced leaking joints and ground water collecting in the conveyor tunnel under their main gypsum dome.  With joint leaks and water levels rising, engineers have to act fast in order to keep the facility from potential shutdown.

Commercial Concrete Lifting

A brief clip of URETEK ICR commercial solutions available to commercial and industrial property and facility managers.

URETEK Injectable  Barrier

A potentially harmful soil contaminant puts a Florida city on alert.  Find out how URETEK solves this problem using a unique geopolymer solution to form an underground barrier.